Gutted by fire this high end residential premises in London’s premier residential area required a complete refurbishment to restore the property back to its original condition overseen by the local conservation officer. Access and egress as is so often the case in London required careful planning with limited storage on site not helping construction logistics mindful of adjoining occupied properties.

An initial de contamination process was undertaken prior to undertaking structural works that included the replacement of the existing stone stairs with new, and the replacement of all floor joists to the ground floor and rear roof terrace.

Fire damaged joinery was carefully surveyed patterns taken and replicated. Surface finishes were reinstated including fibrous plaster cornices and ceiling roses, floor tiles and hardwood flooring. Bespoke kitchen and bathroom units complemented the high quality finishing.

The new electrical installation included lighting, fire alarms; telephone, data, satellite TV system a door entry system and a ‘Lutron’ home building management system. The mechanical installation comprised comfort cooling, hot and cold water adaptations, kitchen and bathroom services.

The project was brought in on time, to budget with the Client praising the high standard of workmanship and finishing.

st-georges-1
st-georges-2